RRB Junior Engineer / DMS / CMA 2019 · Question 3718 of 3719
The spiral model, initially proposed by Boehm, is an evolutionary software process model that couples the iterative feature of prototyping with the controlled and systematic aspects of the linear sequential model. Determining Objective: Each cycle in the spiral starts with the identification of purpose for that cycle, the various alternatives that are possible for achieving the targets, and the constraints that exist. Risk Assessment and reduction: The next phase in the cycle is to calculate these various alternatives based on the goals and constraints. The focus of evaluation in this stage is located on the risk perception for the project. Development and validation: The next phase is to develop strategies that resolve uncertainties and risks. This process may include activities such as benchmarking, simulation, and prototyping. Planning: Finally, the next step is planned. The project is reviewed, and a choice made whether to continue with a further period of the spiral. If it is determined to keep, plans are drawn up for the next step of the project
Source: RRB JE 2019 (CBT 2) (IT) Previous Year Paper (30 Aug 2019) — prepp.in solved-paper PDF (answer key with explanations) · reliable-secondary
Practice the full RRB Junior Engineer / DMS / CMA 2019 paper
Timed test with all 3719 questions, just like the real exam.
Start test